Assignment Overview
All of the monitoring and controlling strategies used during the project must be identified in the Monitor and Control document. The Monitor and Control template provided allows the you to present this information in an organized and visually appealing table format. Project management knowledge areas are provided within the template; each knowledge area is to be addressed according to the following:
- Monitoring and Controlling Process
- Monitoring and Controlling Outputs
- Frequency
- Detailed Description of F or E Ratings
A written summary must be included at the bottom of the template (please see directives below the frequency key).
Answer Guide:Monitor and Control
Project Management
Knowledge Area |
Monitoring and Controlling | Frequency | Detailed Description of (F) or (E) ratings | |
Process | Outputs | |||
Integration Management | Monitor the integration of fall prevention tools such as bed alarms. Monitor the integration of the fall prevention protocol. | Staff utilization of bed alarms and compliance with protocols | F | Frequent monitoring is important because the staff may experience challenges adapting to the new fall prevention protocol as well as bed alarm technology. |